Solar Installation Process for Homes: Step-by-Step Guide to Going Solar

October 23, 2024Solis Energy TeamInstallation

What to Expect When You Go Solar in Alberta

Going solar is a significant home improvement project, but the process is more straightforward than most homeowners expect. Here's exactly what happens from your first call to the day your system starts generating power.

Step 1: Free Energy Assessment

Every project starts with a free energy assessment. We review your electricity bills, your roof orientation and pitch, shading from trees or neighbouring structures, and your energy goals.

This assessment is completely free and comes with no obligation. We'll tell you honestly whether solar makes financial sense for your specific situation — and if it doesn't, we'll tell you that too.

What we look at:

  • 12 months of electricity bills (kWh usage)
  • Google Maps satellite view of your roof
  • Shading analysis
  • Local electricity rates and net metering rules
  • Step 2: Custom System Design

    Once you decide to move forward, our design team creates a custom system layout using satellite imagery and solar modelling software. We calculate:

  • Optimal panel placement and quantity
  • Expected annual production (kWh)
  • Estimated annual savings
  • Payback period and 25-year ROI
  • You'll receive a detailed proposal with all of this information before signing anything.

    Step 3: Permits and Utility Application

    In Alberta, solar installations require a building permit and an application to your utility for grid connection (net metering). We handle all of this paperwork on your behalf.

    Permit timelines vary by municipality — typically 2–6 weeks for most Rocky View County and Calgary-area communities.

    Step 4: Installation Day

    Most residential systems are installed in one to two days. Our certified installation team handles everything:

  • Roof mounting hardware
  • Panel installation
  • Wiring and conduit runs
  • Inverter and monitoring system installation
  • Electrical panel connection
  • We clean up completely before leaving and walk you through your new monitoring app.

    Step 5: Utility Inspection and Activation

    After installation, your utility company inspects the system and approves grid connection. This typically takes 1–3 weeks after installation. Once approved, your system is activated and you start generating power — and saving money.

    How Long Does the Whole Process Take?

    From signed contract to activation, most Alberta residential solar projects take 6–10 weeks depending on permit timelines and utility scheduling.

    Ready to Start?

    Use the free energy assessment tool at QuotePath.ca to get a personalized estimate of your solar savings before you even speak to an installer.

    SE
    Solis Energy Team

    Solis Energy is a locally owned Alberta solar installation company serving residential, farm, and commercial customers across the Calgary region. Our team of certified installers has completed 500+ solar projects across Alberta.

    Visit Solis Energy
    Homeowners

    Get a Free Solar Assessment

    Talk to Solis Energy — locally owned Alberta solar installers serving Calgary and surrounding communities.

    Contact Solis Energy
    Farms & Commercial

    Get an Expert Energy Assessment

    QuotePath analyzes your demand charges, rate structure, and ROI before you commit to any upgrade. Free, no obligation.

    Visit QuotePath.ca